Recognise the situation
Common enquiries and what changes the job
Daytime generation is high but bills stay high
The household may consume most of its electricity outside solar hours; load timing matters.
Customer asks for a much larger battery
Required night-time loads and outage duration should be identified before upsizing.
New EV charger is planned
Future charging time, phase availability and tariff should be included in the profile.
Quotation scope
What affects the cost and work programme?
- Reliable usage data availability
- Day and evening load patterns
- Desired backup circuits
- Roof and installation constraints
- Design and authorisation requirements
Where applicable in the City of Cape Town electricity supply area, new solar PV/battery systems and relevant system changes must follow the City authorisation process. Professional sign-off and suitable approved inverters are important requirements; never activate an unauthorised modified system.
Translate electricity consumption into system priorities
A bill shows energy consumed over time, but inverter sizing also depends on power demanded at once. A household with a heavy evening peak may need a different configuration from a home using most electricity during sunny hours. Separate daytime loads, essential backup circuits and high-consumption appliances, then ask an installer to set out inverter kW, panel kWp and usable battery kWh rather than one undifferentiated system size.