Separate installation complete from ready to energise
Panels and an inverter may be physically mounted yet the system still requires safety testing and the relevant utility authorisation. In the City of Cape Town supply area, the commissioning requirements include appropriate sign-off and records before the system may be switched on. We ask whether permission to install exists, what equipment was installed and who has responsibility for the commissioning documents. A handover inspection should identify missing evidence rather than assume a working display proves legal or electrical completeness.