Confirm the layout before any chasing or pipe movement
A floor plan should locate the basin, shower, WC, dishwasher, oven, extractor and every proposed electrical point. For bathroom work, the chosen fixture dimensions affect waste positions, water inlets, access panels and the amount of space available behind finished surfaces. In kitchens, cabinet dimensions and appliance clearances affect socket placement, isolators and supply routes. Guessing these before product selections are final creates avoidable rework.
Ask whether existing drains have sufficient fall and whether new pipe routes interfere with beams or load-bearing elements. Alterations to structural components require appropriate professional advice and approvals. Identify municipal and building-plan obligations at the planning stage, particularly for changes beyond simple like-for-like replacement.
