Start with drawings, fixture schedules and site constraints
New construction plumbing is easier to install correctly when supply and waste routes are agreed before concrete, walls and cabinets are finished. We ask for approved layouts, bathroom and kitchen positions, fixture specifications and the proposed water source. Pipe routes must coordinate with structural elements and other trades rather than being improvised once ceilings have closed. The builder, client and plumbing contractor should agree which drawings are current and who can authorise a change.